PortSusan 27Dec12 * SG099 * Dive index * Mission links * Dive 509 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 127.20 of 300.00 AH used of 24V (57.60% remains)
• Previous NAKs 0, Timeouts 0 • 53.31 of 100.00 AH used of 10V (46.69% remains)
• Surface angle -50.0 deg, depth -0.01 m • Intended pitch -21.3 deg, speed -10.000 cm/s
VBD pumped to 622.57 (SM_CC=640)
• GPS1 time: 8 s • bottom range 0.0 m at 27.5 m, depth 28 m (100 m grid)
• GPS2 time: 35 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
20 end surface: CONTROL_FINISHED_OK
20 begin dive
24 - - - 96 done -1.51 - - 326 - - - 2037 - -146.0 -67.47 - 3704 - - - - - - - - - - 24.18
101 0.3 -1.5 14 114 roll -1.51 5.47 - 1410 198.2 2.58 - 556 -574.0 -146.0 -0.08 - 3718 -175.0 - - - - - - - 24.17 24.17 24.18
401 37.5 -11.9 60 406 done -1.51 - - 1408 - 2.67 - 2016 546.8 -146.0 -0.05 - 3731 -260.0 - - - - - - - - 24.17 24.15
462 end dive: TARGET_DEPTH_EXCEEDED
462 begin apogee
470 45.5 -11.7 66 601 done -0.31 1.35 - 1673 196.3 - - 2015 - - 119.78 - 3129 -5.0 - - - - - - - 24.17 - 24.12
602 end apogee: CONTROL_FINISHED_OK
602 begin climb
606 47.6 - 79 737 done 1.51 1.92 - 2056 199.5 - - 2021 - 146.0 122.18 - 2533 -4.9 - - - - - - - 24.17 - 24.11
987 end climb: SURFACE_DEPTH_REACHED
987 begin surface coast
1009 end surface coast: CONTROL_FINISHED_OK
1009 begin surface
SM -0.01 - - - - -6.36 8.80 - 322 36.6 - - 2018 - 622.57 - - 588 - - - - - - - -