HoodCanal Jan18 * SG195 * Dive index * Mission links * Dive 506 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 92.21 of 150.00 AH used of 24V (38.53% remains)
• Previous NAKs 0, Timeouts 0 • 62.48 of 97.00 AH used of 10V (35.58% remains)
• Surface angle -63.6 deg, depth 1.61 m • Intended pitch -25.8 deg, speed -10.000 cm/s
VBD pumped to 428.54 (beyond SM_CC=420)
• GPS1 time: 5 s
• GPS2 time: 6 s • Transponder ping count: 0
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
6 end surface: CONTROL_FINISHED_OK
6 begin dive
9 - - - 53 VBD -1.15 - - 179 - - - 1827 - -70.5 -42.03 - 1494 - - - - - - - - 26.55 - 26.57
57 2.0 -1.7 6 121 roll -1.23 8.60 0.195 2401 258.4 2.30 0.050 3261 623.5 -157.7 -48.28 - 2891 -28.9 - - - - - - - 24.92 23.82 25.11
494 97.3 -20.6 56 504 done -1.16 0.10 0.144 2431 300.0 2.12 0.028 1832 -674.1 -157.7 - - 2891 - - - - - - - - 25.67 26.08 25.77
624 124.5 -20.1 69 625 done -1.16 - - 2431 - - - 1832 - -157.7 - - 2891 - - - - - - - - 26.66 26.67 26.67
805 160.5 -19.7 87 812 done -1.16 - - 2431 - - - 1832 - -157.7 - - 2891 - - - - - - - - 26.63 26.64 26.63
982 end dive: NO_VERTICAL_VELOCITY
982 begin apogee
987 164.3 - 105 1124 done -0.21 0.93 0.108 2740 332.3 - - 1831 - - 126.40 0.653 2246 -5.1 0.132 - - - - - - 25.27 24.87 24.01
1125 end apogee: CONTROL_FINISHED_OK
1125 begin climb
1127 164.2 - 119 1264 done 1.23 1.38 0.106 3185 322.5 - - 1831 - 157.7 132.55 0.632 1604 -4.8 0.130 - - - - - - 25.10 24.75 23.91
1292 end climb: NO_VERTICAL_VELOCITY
1292 begin surface
SM 1.65 - - - - -8.09 8.27 0.057 175 21.1 - - 1831 - 431.73 - - 488 - - - - - - - -