DavisStrait May07 * SG001 * Dive index * Mission links * Dive 499 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 25.07 of 91.80 AH used of 24V (72.69% remains)
• Previous NAKs 0, Timeouts 0 • 11.25 of 61.20 AH used of 10V (81.62% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 999.0 m at 4.9 m depth, ceiling -994.1 m
• GPS1 time: 34 s
• GPS2 time: 12 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 630 - - - 2061 - -121.6 -43.72 - 2757 - - - - - - - - - - -
101 0.4 - 6 125 roll -1.07 6.78 - 2073 212.8 2.62 - 600 -557.6 -121.6 - - 2755 - - - - - - - - - - -
239 15.4 7.0 21 350 done -0.25 0.82 - 2274 245.1 - - 2498 - - 98.25 0.001 2264 -5.0 7.966 - - - - - - - - -
356 21.1 - 34 469 roll 1.07 1.17 - 2554 239.3 2.72 - 3789 474.6 121.6 98.72 0.001 1763 -5.1 11.083 - - - - - - - - -
SM 0.33 - - - - -7.59 - - 636 - - - 2093 - 200.90 49.75 0.001 1442 -6.5 0.218 - - - - - -