DavisStrait May07 * SG001 * Dive index * Mission links * Dive 488 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 24.54 of 91.80 AH used of 24V (73.26% remains)
• Previous NAKs 2, Timeouts 0 • 11.07 of 61.20 AH used of 10V (81.91% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.9 m at 5.4 m depth, ceiling 2.5 m
• GPS1 time: 12 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 587 - - - 2066 - -121.6 -43.15 - 2754 - - - - - - - - - - -
102 0.7 -0.6 6 122 roll -1.07 7.00 - 2095 215.4 2.42 - 590 -609.9 -121.6 - - 2749 - - - - - - - - - - -
251 15.2 5.9 23 352 done -0.25 0.57 - 2251 273.7 - - 2583 - - 96.20 0.001 2266 -5.0 7.899 - - - - - - - - -
359 20.5 - 35 472 roll 1.07 1.10 - 2526 250.0 2.58 - 3763 457.4 121.6 99.25 0.001 1772 -5.0 10.561 - - - - - - - - -
SM 0.34 - - - - -7.42 - - 660 - - - 2159 - 200.41 49.75 - 1441 -6.7 INF - - - - - -