DavisStrait May07 * SG001 * Dive index * Mission links * Dive 479 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 24.07 of 91.80 AH used of 24V (73.78% remains)
• Previous NAKs 0, Timeouts 0 • 10.92 of 61.20 AH used of 10V (82.15% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 7.3 m at 5.9 m depth, ceiling -1.4 m
• GPS1 time: 6 s
• GPS2 time: 14 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 625 - - - 2075 - -121.6 -43.67 - 2758 - - - - - - - - - - -
102 0.6 -0.5 6 122 roll -1.07 7.00 - 2092 209.6 2.62 - 608 -559.9 -121.6 - - 2760 - - - - - - - - - - -
252 15.2 5.9 23 361 done -0.25 0.68 - 2264 252.9 - - 2477 - - 99.30 0.001 2267 -5.0 7.811 - - - - - - - - -
368 20.7 - 35 482 roll 1.07 1.25 - 2541 221.6 3.12 - 3789 420.5 121.6 98.40 0.001 1767 -5.1 10.887 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 630 - - - 2045 - 200.16 48.70 - 1454 -6.4 INF - - - - - -