DavisStrait May07 * SG001 * Dive index * Mission links * Dive 473 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 23.76 of 91.80 AH used of 24V (74.11% remains)
• Previous NAKs 0, Timeouts 0 • 10.82 of 61.20 AH used of 10V (82.31% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.39 (beyond SM_CC=200) • surface range 0.9 m at 5.0 m depth, ceiling 4.1 m
• GPS1 time: 13 s
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 634 - - - 2078 - -121.6 -43.38 - 2758 - - - - - - - - - - -
102 0.5 -0.3 6 122 roll -1.07 7.28 - 2079 198.5 2.62 - 593 -566.8 -121.6 - - 2753 - - - - - - - - - - -
238 15.7 6.6 22 350 done -0.25 0.93 - 2275 210.8 - - 2320 - - 97.88 0.001 2261 -5.0 8.168 - - - - - - - - -
357 21.0 - 35 470 roll 1.07 1.12 - 2521 219.6 2.33 - 3795 633.0 121.6 98.35 0.001 1765 -5.0 10.962 - - - - - - - - -
SM 0.34 - - - - -7.66 - - 637 - - - 2066 - 201.39 49.97 - 1445 -6.4 INF - - - - - -