DavisStrait May07 * SG001 * Dive index * Mission links * Dive 454 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 22.84 of 91.80 AH used of 24V (75.12% remains)
• Previous NAKs 0, Timeouts 0 • 10.51 of 61.20 AH used of 10V (82.83% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 3.4 m at 5.5 m depth, ceiling 2.1 m
• GPS1 time: 8 s
• GPS2 time: 19 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 95 done -1.07 - - 611 - - - 2023 - -121.6 -43.60 - 2754 - - - - - - - - - - -
102 0.3 - 6 126 roll -1.07 7.03 - 2081 209.1 2.42 - 711 -542.1 -121.6 - - 2754 - - - - - - - - - - -
256 15.2 6.4 23 367 done -0.25 0.68 - 2258 260.3 - - 2561 - - 99.45 0.001 2263 -4.9 7.767 - - - - - - - - -
375 20.8 - 36 488 roll 1.07 1.40 - 2563 217.9 1.83 - 3801 677.6 121.6 97.82 0.001 1766 -5.1 10.938 - - - - - - - - -
SM 0.33 - - - - -7.53 - - 649 - - - 2183 - 200.66 48.97 - 1445 -6.6 INF - - - - - -