DavisStrait May07 * SG001 * Dive index * Mission links * Dive 449 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 22.59 of 91.80 AH used of 24V (75.39% remains)
• Previous NAKs 0, Timeouts 0 • 10.43 of 61.20 AH used of 10V (82.96% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 3.9 m at 5.8 m depth, ceiling 1.9 m
• GPS1 time: 8 s
• GPS2 time: 38 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 591 - - - 2185 - -121.6 -43.30 - 2755 - - - - - - - - - - -
101 0.4 -0.1 6 125 roll -1.07 7.03 - 2088 212.9 2.78 - 734 -521.9 -121.6 - - 2759 - - - - - - - - - - -
247 15.0 6.6 22 357 done -0.25 0.80 - 2242 192.5 - - 2468 - - 97.75 0.001 2262 -5.1 7.894 - - - - - - - - -
364 20.5 - 35 476 roll 1.07 1.50 - 2557 210.0 2.80 - 3790 472.1 121.6 98.03 0.001 1769 -5.0 10.671 - - - - - - - - -
SM 0.33 - - - - -7.53 - - 610 - - - 2157 - 200.41 49.67 0.001 1442 -6.6 0.222 - - - - - -