DavisStrait May07 * SG001 * Dive index * Mission links * Dive 432 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 21.80 of 91.80 AH used of 24V (76.25% remains)
• Previous NAKs 2, Timeouts 0 • 10.15 of 61.20 AH used of 10V (83.41% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 5.4 m at 5.0 m depth, ceiling -0.4 m
• GPS1 time: 23 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 606 - - - 2058 - -121.6 -43.35 - 2756 - - - - - - - - - - -
109 0.5 -0.3 6 129 roll -1.07 7.03 - 2069 208.1 2.38 - 605 -610.5 -121.6 - - 2764 - - - - - - - - - - -
226 15.3 6.9 19 334 done -0.25 0.85 - 2235 195.3 - - 2484 - - 98.50 0.001 2263 -5.1 8.055 - - - - - - - - -
340 20.7 - 31 454 roll 1.07 1.45 - 2562 225.5 2.70 - 3790 483.7 121.6 98.25 0.001 1758 -5.1 11.012 - - - - - - - - -
SM 0.34 - - - - -7.50 - - 628 - - - 2076 - 200.16 49.75 - 1449 -6.2 INF - - - - - -