DavisStrait May07 * SG001 * Dive index * Mission links * Dive 427 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 21.55 of 91.80 AH used of 24V (76.53% remains)
• Previous NAKs 2, Timeouts 0 • 10.08 of 61.20 AH used of 10V (83.54% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 5.4 m at 5.4 m depth, ceiling 0.0 m
• GPS1 time: 35 s
• GPS2 time: 25 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 648 - - - 2075 - -121.6 -44.00 - 2763 - - - - - - - - - - -
103 0.3 - 6 122 roll -1.07 6.75 - 2109 216.4 2.62 - 591 -566.4 -121.6 - - 2759 - - - - - - - - - - -
242 15.0 5.6 22 353 done -0.25 1.00 - 2257 148.0 - - 2483 - - 99.00 0.001 2264 -5.0 7.763 - - - - - - - - -
359 20.1 - 35 471 roll 1.07 1.12 - 2534 247.3 2.62 - 3792 499.6 121.6 97.70 0.001 1769 -5.1 10.540 - - - - - - - - -
SM 0.34 - - - - -7.36 - - 653 - - - 2053 - 200.90 49.85 - 1444 -6.5 INF - - - - - -