DavisStrait May07 * SG001 * Dive index * Mission links * Dive 423 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 21.34 of 91.80 AH used of 24V (76.75% remains)
• Previous NAKs 2, Timeouts 0 • 10.01 of 61.20 AH used of 10V (83.64% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.4 m at 5.6 m depth, ceiling 3.2 m
• GPS1 time: 13 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 659 - - - 2035 - -121.6 -43.05 - 2761 - - - - - - - - - - -
102 0.7 -0.7 6 122 roll -1.07 7.28 - 2087 196.2 2.35 - 577 -620.4 -121.6 - - 2757 - - - - - - - - - - -
253 15.0 6.0 23 361 done -0.25 0.70 - 2260 247.1 - - 2455 - - 97.70 0.001 2269 -5.0 7.755 - - - - - - - - -
368 20.5 - 35 482 roll 1.07 1.20 - 2538 231.7 2.92 - 3799 460.3 121.6 99.45 0.001 1761 -5.1 10.838 - - - - - - - - -
SM 0.34 - - - - -7.44 - - 647 - - - 2078 - 200.16 48.58 0.001 1445 -6.5 0.226 - - - - - -