DavisStrait May07 * SG001 * Dive index * Mission links * Dive 416 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 20.99 of 91.80 AH used of 24V (77.14% remains)
• Previous NAKs 0, Timeouts 0 • 9.89 of 61.20 AH used of 10V (83.83% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 4.8 m at 4.1 m depth, ceiling -0.7 m
• GPS1 time: 33 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 624 - - - 2066 - -121.6 -43.80 - 2766 - - - - - - - - - - -
102 0.4 -0.2 6 122 roll -1.07 7.00 - 2114 212.9 2.22 - 588 -665.8 -121.6 - - 2757 - - - - - - - - - - -
269 15.4 5.4 26 380 done -0.25 0.80 - 2273 198.8 - - 2503 - - 99.22 0.001 2268 -4.9 7.856 - - - - - - - - -
387 20.5 - 39 499 roll 1.07 1.12 - 2538 236.6 2.62 - 3799 494.7 121.6 98.43 0.001 1763 -5.1 10.886 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 611 - - - 2037 - 200.41 49.97 - 1451 -6.2 INF - - - - - -