DavisStrait May07 * SG001 * Dive index * Mission links * Dive 411 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 20.73 of 91.80 AH used of 24V (77.42% remains)
• Previous NAKs 0, Timeouts 0 • 9.81 of 61.20 AH used of 10V (83.97% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 24 s
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 621 - - - 2082 - -121.6 -43.42 - 2759 - - - - - - - - - - -
101 0.4 -0.1 6 121 roll -1.07 6.90 - 2054 207.7 2.53 - 609 -582.2 -121.6 - - 2758 - - - - - - - - - - -
243 15.2 7.4 22 354 done -0.25 0.93 - 2267 229.0 - - 2486 - - 97.47 0.001 2268 -5.0 7.909 - - - - - - - - -
361 21.1 - 35 473 roll 1.07 1.42 - 2521 178.9 2.10 - 3784 618.1 121.6 99.07 0.001 1773 -5.0 10.912 - - - - - - - - -
SM 0.34 - - - - -7.39 - - 663 - - - 2209 - 200.16 49.62 - 1453 -6.4 INF - - - - - -