DavisStrait May07 * SG001 * Dive index * Mission links * Dive 409 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 20.63 of 91.80 AH used of 24V (77.53% remains)
• Previous NAKs 0, Timeouts 0 • 9.78 of 61.20 AH used of 10V (84.02% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 4.3 m at 5.8 m depth, ceiling 1.5 m
• GPS1 time: 32 s
• GPS2 time: 34 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 647 - - - 2043 - -121.6 -43.55 - 2755 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.05 - 2058 200.1 2.33 - 557 -637.8 -121.6 - - 2750 - - - - - - - - - - -
236 15.3 7.5 21 348 done -0.25 1.00 - 2266 208.0 - - 2323 - - 98.00 0.001 2256 -5.0 7.983 - - - - - - - - -
354 21.0 - 34 466 roll 1.07 2.10 - 2502 112.4 2.83 - 3795 520.1 121.6 98.07 0.001 1763 -5.0 10.926 - - - - - - - - -
SM 0.34 - - - - -7.52 - - 635 - - - 2028 - 200.16 49.38 - 1450 -6.3 INF - - - - - -