DavisStrait May07 * SG001 * Dive index * Mission links * Dive 401 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 20.22 of 91.80 AH used of 24V (77.97% remains)
• Previous NAKs 0, Timeouts 0 • 9.65 of 61.20 AH used of 10V (84.24% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 4.9 m at 5.7 m depth, ceiling 0.8 m
• GPS1 time: 30 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 617 - - - 2042 - -121.6 -43.42 - 2759 - - - - - - - - - - -
102 0.6 -0.4 6 122 roll -1.07 7.03 - 2098 210.7 1.98 - 867 -593.4 -121.6 - - 2757 - - - - - - - - - - -
255 15.5 5.9 24 366 done -0.25 0.70 - 2252 220.0 - - 2589 - - 97.75 0.001 2270 -5.0 7.993 - - - - - - - - -
374 20.6 - 37 486 roll 1.07 1.48 - 2565 211.5 2.12 - 3795 568.9 121.6 98.62 0.001 1765 -5.1 10.918 - - - - - - - - -
SM 0.34 - - - - -7.71 - - 599 - - - 2047 - 200.90 48.65 - 1449 -6.5 INF - - - - - -