DavisStrait May07 * SG001 * Dive index * Mission links * Dive 400 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 20.17 of 91.80 AH used of 24V (78.03% remains)
• Previous NAKs 2, Timeouts 0 • 9.63 of 61.20 AH used of 10V (84.26% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.3 m at 5.3 m depth, ceiling -1.0 m
• GPS1 time: 21 s • bottom range 5.7 m at 6.3 m, depth 12 m (15 m grid)
• GPS2 time: 22 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 609 - - - 2036 - -121.6 -43.62 - 2759 - - - - - - - - - - -
102 0.4 - 6 127 roll -1.07 7.28 - 2086 202.9 1.95 - 701 -684.6 -121.6 - - 2760 - - - - - - - - - - -
153 9.9 13.3 9 264 done -0.25 0.65 - 2263 272.3 - - 2482 - - 98.90 0.001 2261 -5.0 5.170 - - - - - - - - -
271 15.1 - 22 372 roll 1.07 2.00 - 2580 158.5 2.53 - 3786 515.4 121.6 91.72 0.001 1761 -5.5 8.520 - - - - - - - - -
SM 0.34 - - - - -7.60 - - 609 - - - 2046 - 200.41 48.55 - 1441 -6.6 INF - - - - - -