DavisStrait May07 * SG001 * Dive index * Mission links * Dive 390 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 19.67 of 91.80 AH used of 24V (78.57% remains)
• Previous NAKs 2, Timeouts 0 • 9.47 of 61.20 AH used of 10V (84.53% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 4.9 m at 5.3 m depth, ceiling 0.4 m
• GPS1 time: 27 s
• GPS2 time: 36 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 622 - - - 2062 - -121.6 -43.30 - 2756 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.03 - 2101 210.4 2.62 - 597 -559.2 -121.6 - - 2759 - - - - - - - - - - -
245 15.3 6.2 22 356 done -0.25 0.68 - 2249 217.6 - - 2314 - - 99.47 0.001 2266 -5.0 7.849 - - - - - - - - -
362 20.8 - 35 475 roll 1.07 1.33 - 2528 209.8 2.42 - 3793 611.2 121.6 97.75 0.001 1772 -5.1 10.880 - - - - - - - - -
SM 0.34 - - - - -7.59 - - 609 - - - 2029 - 200.66 49.85 - 1450 -6.5 INF - - - - - -