DavisStrait May07 * SG001 * Dive index * Mission links * Dive 331 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 16.72 of 91.80 AH used of 24V (81.78% remains)
• Previous NAKs 2, Timeouts 0 • 8.51 of 61.20 AH used of 10V (86.10% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 5.5 m at 5.6 m depth, ceiling 0.1 m
• GPS1 time: 9 s
• GPS2 time: 34 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 629 - - - 2073 - -121.6 -43.45 - 2758 - - - - - - - - - - -
102 0.7 -0.6 6 122 roll -1.07 6.93 - 2057 206.1 3.35 - 584 -444.5 -121.6 - - 2757 - - - - - - - - - - -
230 15.2 7.3 20 341 done -0.25 0.82 - 2287 280.5 - - 2492 - - 99.22 0.001 2260 -5.0 7.880 - - - - - - - - -
347 20.9 - 33 460 roll 1.07 1.27 - 2518 181.9 2.38 - 3790 545.4 121.6 98.38 0.001 1761 -5.1 10.972 - - - - - - - - -
SM 0.34 - - - - -7.66 - - 609 - - - 2058 - 200.16 48.88 - 1442 -6.5 INF - - - - - -