DavisStrait May07 * SG001 * Dive index * Mission links * Dive 326 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 16.47 of 91.80 AH used of 24V (82.06% remains)
• Previous NAKs 0, Timeouts 0 • 8.43 of 61.20 AH used of 10V (86.23% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 4.6 m at 5.7 m depth, ceiling 1.1 m
• GPS1 time: 24 s
• GPS2 time: 24 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 610 - - - 2058 - -121.6 -43.22 - 2759 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 7.00 - 2113 214.7 2.62 - 591 -559.9 -121.6 - - 2758 - - - - - - - - - - -
279 15.1 5.7 27 389 done -0.25 0.75 - 2263 200.0 - - 2441 - - 98.45 0.001 2263 -5.0 7.858 - - - - - - - - -
396 20.4 - 40 508 roll 1.07 1.15 - 2530 232.2 2.53 - 3799 536.8 121.6 98.65 0.001 1764 -5.1 10.680 - - - - - - - - -
SM 0.34 - - - - -7.52 - - 632 - - - 2056 - 200.90 48.53 - 1453 -6.4 INF - - - - - -