DavisStrait May07 * SG001 * Dive index * Mission links * Dive 321 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 16.21 of 91.80 AH used of 24V (82.34% remains)
• Previous NAKs 2, Timeouts 0 • 8.34 of 61.20 AH used of 10V (86.37% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 1.4 m at 5.7 m depth, ceiling 4.3 m
• GPS1 time: 14 s
• GPS2 time: 35 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 595 - - - 1976 - -121.6 -43.22 - 2758 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 7.55 - 2039 191.3 2.17 - 681 -596.8 -121.6 - - 2761 - - - - - - - - - - -
224 15.4 8.4 19 335 done -0.25 0.88 - 2263 254.5 - - 2541 - - 98.93 0.001 2265 -5.0 7.991 - - - - - - - - -
341 21.2 - 32 453 roll 1.07 1.30 - 2509 189.2 2.03 - 3788 614.3 121.6 98.43 0.001 1765 -5.1 11.146 - - - - - - - - -
SM 0.34 - - - - -7.49 - - 625 - - - 2054 - 200.16 49.72 - 1446 -6.4 INF - - - - - -