DavisStrait May07 * SG001 * Dive index * Mission links * Dive 312 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 15.78 of 91.80 AH used of 24V (82.81% remains)
• Previous NAKs 0, Timeouts 0 • 8.20 of 61.20 AH used of 10V (86.60% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 2.9 m at 4.1 m depth, ceiling 1.2 m
• GPS1 time: 11 s
• GPS2 time: 9 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 102 done -1.07 - - 594 - - - 2233 - -121.6 -43.00 - 2761 - - - - - - - - - - -
109 1.1 -1.4 6 130 roll -1.07 7.03 - 2098 213.9 2.62 - 636 -609.5 -121.6 - - 2762 - - - - - - - - - - -
222 15.2 6.2 18 329 done -0.25 0.62 - 2257 256.5 - - 2527 - - 98.40 0.001 2265 -5.1 7.946 - - - - - - - - -
335 20.7 - 30 450 roll 1.07 1.50 - 2559 201.3 2.30 - 3786 547.4 121.6 98.57 0.001 1774 -5.0 10.672 - - - - - - - - -
SM 0.34 - - - - -7.60 - - 615 - - - 2015 - 200.66 49.33 0.001 1446 -6.6 0.231 - - - - - -