DavisStrait May07 * SG001 * Dive index * Mission links * Dive 300 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 15.21 of 91.80 AH used of 24V (83.43% remains)
• Previous NAKs 0, Timeouts 0 • 8.01 of 61.20 AH used of 10V (86.92% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 2.8 m at 5.4 m depth, ceiling 2.6 m
• GPS1 time: 22 s
• GPS2 time: 10 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 95 done -1.07 - - 638 - - - 2196 - -121.6 -43.08 - 2761 - - - - - - - - - - -
107 0.8 -0.9 6 129 roll -1.07 6.70 - 2081 215.4 2.83 - 578 -571.7 -121.6 - - 2758 - - - - - - - - - - -
226 15.6 7.3 19 337 done -0.25 0.82 - 2226 176.8 - - 2315 - - 98.40 0.001 2266 -5.0 8.073 - - - - - - - - -
343 21.0 - 32 455 roll 1.07 1.38 - 2555 238.4 3.12 - 3793 473.7 121.6 98.82 0.001 1764 -5.1 11.041 - - - - - - - - -
SM 0.34 - - - - -7.50 - - 623 - - - 2024 - 200.90 49.85 - 1441 -6.5 INF - - - - - -