DavisStrait May07 * SG001 * Dive index * Mission links * Dive 288 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 14.62 of 91.80 AH used of 24V (84.08% remains)
• Previous NAKs 2, Timeouts 0 • 7.81 of 61.20 AH used of 10V (87.24% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 1.1 m at 5.5 m depth, ceiling 4.4 m
• GPS1 time: 30 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 97 done -1.07 - - 639 - - - 2052 - -121.6 -43.35 - 2761 - - - - - - - - - - -
108 0.4 -0.1 6 120 roll -1.07 6.97 - 2087 207.7 2.17 - 745 -602.3 -121.6 - - 2762 - - - - - - - - - - -
239 15.1 5.9 20 350 done -0.25 0.68 - 2274 275.0 - - 2472 - - 99.47 0.001 2263 -5.0 7.840 - - - - - - - - -
356 20.6 - 33 467 roll 1.07 1.45 - 2580 211.0 2.53 - 3798 524.1 121.6 98.53 0.001 1774 -5.0 10.582 - - - - - - - - -
SM 0.34 - - - - -7.54 - - 632 - - - 2025 - 200.16 49.45 - 1440 -6.8 INF - - - - - -