DavisStrait May07 * SG001 * Dive index * Mission links * Dive 287 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 14.57 of 91.80 AH used of 24V (84.13% remains)
• Previous NAKs 0, Timeouts 0 • 7.79 of 61.20 AH used of 10V (87.27% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.4 m at 4.4 m depth, ceiling -2.0 m
• GPS1 time: 31 s
• GPS2 time: 25 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 95 done -1.07 - - 625 - - - 2200 - -121.6 -43.47 - 2769 - - - - - - - - - - -
107 0.5 -0.3 6 121 roll -1.07 6.93 - 2069 208.4 3.47 - 732 -423.1 -121.6 - - 2764 - - - - - - - - - - -
221 15.0 7.2 18 331 done -0.25 1.02 - 2278 204.9 - - 2489 - - 99.62 0.001 2262 -5.0 7.823 - - - - - - - - -
338 20.9 - 31 450 roll 1.07 1.12 - 2545 238.4 2.55 - 3794 511.8 121.6 98.60 0.001 1765 -5.0 10.904 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 638 - - - 2045 - 200.41 48.40 - 1448 -6.5 INF - - - - - -