DavisStrait May07 * SG001 * Dive index * Mission links * Dive 284 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 14.41 of 91.80 AH used of 24V (84.30% remains)
• Previous NAKs 2, Timeouts 0 • 7.74 of 61.20 AH used of 10V (87.35% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 2.6 m at 5.7 m depth, ceiling 3.1 m
• GPS1 time: 19 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 585 - - - 2045 - -121.6 -43.17 - 2755 - - - - - - - - - - -
101 0.6 -0.5 6 126 roll -1.07 7.00 - 2090 215.0 2.83 - 594 -512.7 -121.6 - - 2753 - - - - - - - - - - -
240 15.3 6.6 21 351 done -0.25 1.02 - 2240 147.1 - - 2489 - - 98.32 0.001 2269 -4.9 7.796 - - - - - - - - -
357 20.9 - 34 469 roll 1.07 1.52 - 2567 215.1 2.25 - 3799 582.2 121.6 98.38 0.001 1770 -5.1 10.972 - - - - - - - - -
SM 0.34 - - - - -7.70 - - 592 - - - 2171 - 200.66 49.85 - 1442 -6.6 INF - - - - - -