DavisStrait May07 * SG001 * Dive index * Mission links * Dive 280 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 14.23 of 91.80 AH used of 24V (84.50% remains)
• Previous NAKs 2, Timeouts 0 • 7.68 of 61.20 AH used of 10V (87.45% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 6.9 m at 5.0 m depth, ceiling -1.9 m
• GPS1 time: 13 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 632 - - - 2061 - -121.6 -43.72 - 2760 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.53 - 2095 194.3 2.88 - 705 -470.8 -121.6 - - 2756 - - - - - - - - - - -
279 15.2 5.9 27 388 done -0.25 0.75 - 2271 234.7 - - 2461 - - 99.62 0.001 2255 -5.0 7.912 - - - - - - - - -
396 20.6 - 40 507 roll 1.07 1.15 - 2530 225.2 2.53 - 3787 524.1 121.6 98.93 0.001 1763 -5.0 10.604 - - - - - - - - -
SM 0.34 - - - - -7.60 - - 608 - - - 2003 - 200.16 49.03 - 1449 -6.4 INF - - - - - -