DavisStrait May07 * SG001 * Dive index * Mission links * Dive 279 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 14.18 of 91.80 AH used of 24V (84.56% remains)
• Previous NAKs 2, Timeouts 0 • 7.66 of 61.20 AH used of 10V (87.48% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.0 m at 5.5 m depth, ceiling -0.5 m
• GPS1 time: 12 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 631 - - - 2179 - -121.6 -43.65 - 2760 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 7.03 - 2084 206.7 2.62 - 582 -609.5 -121.6 - - 2763 - - - - - - - - - - -
258 15.2 6.1 24 368 done -0.25 0.62 - 2263 288.7 - - 2489 - - 99.07 0.001 2267 -5.0 7.876 - - - - - - - - -
374 20.4 - 37 486 roll 1.07 1.27 - 2552 227.6 2.33 - 3792 559.2 121.6 98.25 0.001 1773 -5.0 10.616 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 635 - - - 2051 - 200.41 50.17 0.001 1443 -6.6 0.229 - - - - - -