DavisStrait May07 * SG001 * Dive index * Mission links * Dive 272 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 13.84 of 91.80 AH used of 24V (84.93% remains)
• Previous NAKs 2, Timeouts 0 • 7.55 of 61.20 AH used of 10V (87.67% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 4.9 m at 5.1 m depth, ceiling 0.2 m
• GPS1 time: 14 s
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 605 - - - 2045 - -121.6 -43.20 - 2751 - - - - - - - - - - -
102 0.3 - 6 126 roll -1.07 6.80 - 2061 214.1 2.42 - 670 -568.2 -121.6 - - 2761 - - - - - - - - - - -
224 15.2 7.4 19 335 done -0.25 0.85 - 2228 196.5 - - 2439 - - 99.25 0.001 2268 -5.0 7.815 - - - - - - - - -
342 20.5 - 32 454 roll 1.07 1.45 - 2544 217.9 2.62 - 3790 515.6 121.6 98.12 0.001 1763 -5.1 10.920 - - - - - - - - -
SM 0.34 - - - - -7.59 - - 600 - - - 2039 - 200.90 49.53 - 1452 -6.3 INF - - - - - -