DavisStrait May07 * SG001 * Dive index * Mission links * Dive 267 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 13.58 of 91.80 AH used of 24V (85.21% remains)
• Previous NAKs 0, Timeouts 0 • 7.47 of 61.20 AH used of 10V (87.80% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 1.5 m at 5.8 m depth, ceiling 4.3 m
• GPS1 time: 19 s
• GPS2 time: 14 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 638 - - - 2045 - -121.6 -43.30 - 2751 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 6.75 - 2069 212.0 2.17 - 700 -619.8 -121.6 - - 2754 - - - - - - - - - - -
253 15.2 6.9 23 363 done -0.25 0.88 - 2278 237.5 - - 2566 - - 98.07 0.001 2250 -5.1 8.085 - - - - - - - - -
371 20.9 - 36 482 roll 1.07 1.15 - 2535 223.5 2.15 - 3778 563.7 121.6 98.62 0.001 1773 -4.8 10.463 - - - - - - - - -
SM 0.33 - - - - -7.62 - - 593 - - - 2096 - 200.66 48.97 - 1456 -6.5 INF - - - - - -