DavisStrait May07 * SG001 * Dive index * Mission links * Dive 248 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 12.62 of 91.80 AH used of 24V (86.25% remains)
• Previous NAKs 0, Timeouts 0 • 7.16 of 61.20 AH used of 10V (88.30% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 4.8 m at 6.0 m depth, ceiling 1.2 m
• GPS1 time: 18 s
• GPS2 time: 14 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 94 done -1.07 - - 624 - - - 2111 - -121.6 -43.22 - 2756 - - - - - - - - - - -
100 0.5 -0.4 6 124 roll -1.07 7.00 - 2085 208.7 2.42 - 625 -614.0 -121.6 - - 2752 - - - - - - - - - - -
256 15.3 5.9 24 366 done -0.25 0.60 - 2240 258.3 - - 2519 - - 98.45 0.001 2256 -5.0 7.978 - - - - - - - - -
372 20.4 - 37 483 roll 1.07 1.55 - 2567 211.0 2.08 - 3793 612.5 121.6 98.95 0.001 1758 -5.0 10.627 - - - - - - - - -
SM 0.33 - - - - -7.62 - - 615 - - - 2056 - 200.66 49.53 - 1440 -6.4 INF - - - - - -