DavisStrait May07 * SG001 * Dive index * Mission links * Dive 244 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 12.42 of 91.80 AH used of 24V (86.47% remains)
• Previous NAKs 2, Timeouts 0 • 7.10 of 61.20 AH used of 10V (88.40% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.5 m at 5.7 m depth, ceiling -0.8 m
• GPS1 time: 29 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 639 - - - 2030 - -121.6 -43.62 - 2761 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 6.78 - 2098 215.2 2.80 - 672 -485.0 -121.6 - - 2754 - - - - - - - - - - -
238 15.1 5.9 22 348 done -0.25 0.75 - 2257 212.0 - - 2587 - - 98.50 0.001 2264 -5.0 7.775 - - - - - - - - -
354 20.1 - 35 465 roll 1.07 1.38 - 2580 234.1 1.88 - 3774 631.4 121.6 98.32 0.001 1772 -5.0 10.410 - - - - - - - - -
SM 0.33 - - - - -7.43 - - 634 - - - 2150 - 200.41 49.42 - 1451 -6.5 INF - - - - - -