DavisStrait May07 * SG001 * Dive index * Mission links * Dive 243 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 12.36 of 91.80 AH used of 24V (86.53% remains)
• Previous NAKs 0, Timeouts 0 • 7.08 of 61.20 AH used of 10V (88.43% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 999.0 m at 5.5 m depth, ceiling -993.5 m
• GPS1 time: 33 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 95 done -1.07 - - 649 - - - 2058 - -121.6 -43.17 - 2762 - - - - - - - - - - -
106 0.6 -0.6 6 127 roll -1.07 6.78 - 2070 209.6 2.17 - 748 -603.7 -121.6 - - 2757 - - - - - - - - - - -
233 15.3 7.0 20 342 done -0.25 0.85 - 2229 187.1 - - 2491 - - 98.55 0.001 2262 -5.0 7.954 - - - - - - - - -
349 20.9 - 33 460 roll 1.07 1.42 - 2556 230.3 2.33 - 3788 556.7 121.6 97.38 0.001 1766 -5.1 11.018 - - - - - - - - -
SM 0.34 - - - - -7.38 - - 644 - - - 2032 - 200.90 49.88 - 1454 -6.3 INF - - - - - -