DavisStrait May07 * SG001 * Dive index * Mission links * Dive 242 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 12.31 of 91.80 AH used of 24V (86.59% remains)
• Previous NAKs 0, Timeouts 0 • 7.07 of 61.20 AH used of 10V (88.46% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.6 m depth, ceiling -993.4 m
• GPS1 time: 27 s
• GPS2 time: 19 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 93 done -1.07 - - 622 - - - 2095 - -121.6 -43.33 - 2758 - - - - - - - - - - -
100 0.4 - 6 120 roll -1.07 6.75 - 2072 214.8 2.38 - 662 -602.1 -121.6 - - 2762 - - - - - - - - - - -
229 15.2 6.9 21 341 done -0.25 0.98 - 2285 217.3 - - 2574 - - 98.80 0.001 2259 -5.1 8.009 - - - - - - - - -
347 20.6 - 34 459 roll 1.07 1.17 - 2544 221.4 2.42 - 3794 504.1 121.6 98.70 0.001 1765 -5.0 10.672 - - - - - - - - -
SM 0.34 - - - - -7.44 - - 648 - - - 2061 - 200.16 48.80 - 1448 -6.5 INF - - - - - -