DavisStrait May07 * SG001 * Dive index * Mission links * Dive 240 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 12.21 of 91.80 AH used of 24V (86.69% remains)
• Previous NAKs 2, Timeouts 0 • 7.03 of 61.20 AH used of 10V (88.51% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 5.5 m at 5.6 m depth, ceiling 0.1 m
• GPS1 time: 15 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 655 - - - 2174 - -121.6 -43.78 - 2761 - - - - - - - - - - -
108 0.8 -0.9 6 121 roll -1.07 6.78 - 2091 211.8 2.83 - 561 -570.0 -121.6 - - 2769 - - - - - - - - - - -
197 15.1 6.6 15 307 done -0.25 0.65 - 2262 263.1 - - 2609 - - 100.07 0.001 2263 -5.1 7.903 - - - - - - - - -
314 20.4 - 28 424 roll 1.07 1.38 - 2558 214.5 2.33 - 3791 507.3 121.6 97.70 0.001 1771 -5.0 10.633 - - - - - - - - -
SM 0.34 - - - - -7.49 - - 620 - - - 2021 - 200.90 49.40 - 1449 -6.5 INF - - - - - -