DavisStrait May07 * SG001 * Dive index * Mission links * Dive 235 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.96 of 91.80 AH used of 24V (86.97% remains)
• Previous NAKs 2, Timeouts 0 • 6.95 of 61.20 AH used of 10V (88.64% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.8 m depth, ceiling -993.2 m
• GPS1 time: 17 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 94 done -1.07 - - 608 - - - 2204 - -121.6 -43.72 - 2754 - - - - - - - - - - -
101 0.5 -0.3 6 121 roll -1.07 7.00 - 2109 214.4 2.62 - 616 -606.1 -121.6 - - 2754 - - - - - - - - - - -
263 15.0 5.3 25 372 done -0.25 0.77 - 2275 215.6 - - 2503 - - 97.00 0.001 2263 -5.1 7.859 - - - - - - - - -
379 20.1 - 38 490 roll 1.07 1.23 - 2536 212.2 2.17 - 3794 594.9 121.6 98.80 0.001 1771 -5.0 10.360 - - - - - - - - -
SM 0.34 - - - - -7.34 - - 645 - - - 2042 - 200.16 48.83 - 1445 -6.7 INF - - - - - -