DavisStrait May07 * SG001 * Dive index * Mission links * Dive 232 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.81 of 91.80 AH used of 24V (87.14% remains)
• Previous NAKs 0, Timeouts 0 • 6.91 of 61.20 AH used of 10V (88.72% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 14 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 93 done -1.07 - - 628 - - - 2034 - -121.6 -43.30 - 2761 - - - - - - - - - - -
100 0.3 - 6 123 roll -1.07 6.78 - 2081 214.3 2.60 - 595 -553.5 -121.6 - - 2766 - - - - - - - - - - -
254 15.2 6.5 24 364 done -0.25 1.12 - 2188 95.5 - - 2593 - - 99.43 0.001 2256 -5.1 8.069 - - - - - - - - -
370 20.5 - 37 481 roll 1.07 1.73 - 2552 210.4 2.33 - 3790 513.7 121.6 98.05 0.001 1761 -5.0 10.712 - - - - - - - - -
SM 0.33 - - - - -7.48 - - 637 - - - 2013 - 200.41 49.12 - 1438 -6.6 INF - - - - - -