DavisStrait May07 * SG001 * Dive index * Mission links * Dive 231 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.76 of 91.80 AH used of 24V (87.19% remains)
• Previous NAKs 2, Timeouts 0 • 6.89 of 61.20 AH used of 10V (88.74% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.4 m at 5.9 m depth, ceiling -0.5 m
• GPS1 time: 6 s
• GPS2 time: 8 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 648 - - - 2031 - -121.6 -43.62 - 2757 - - - - - - - - - - -
101 0.5 -0.4 6 120 roll -1.07 7.00 - 2110 208.9 2.40 - 692 -557.9 -121.6 - - 2755 - - - - - - - - - - -
254 15.7 7.0 24 362 done -0.25 0.73 - 2268 216.4 - - 2432 - - 97.95 0.001 2257 -5.1 8.262 - - - - - - - - -
369 20.7 - 37 480 roll 1.07 1.40 - 2543 196.4 2.83 - 3792 480.6 121.6 98.85 0.001 1773 -4.9 10.490 - - - - - - - - -
SM 0.34 - - - - -7.51 - - 634 - - - 2032 - 200.41 49.28 0.001 1442 -6.7 0.233 - - - - - -