DavisStrait May07 * SG001 * Dive index * Mission links * Dive 230 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.72 of 91.80 AH used of 24V (87.24% remains)
• Previous NAKs 2, Timeouts 0 • 6.87 of 61.20 AH used of 10V (88.77% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 35 s
• GPS2 time: 20 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 606 - - - 2036 - -121.6 -43.45 - 2762 - - - - - - - - - - -
101 0.5 -0.4 6 125 roll -1.07 7.03 - 2072 208.5 3.05 - 717 -432.5 -121.6 - - 2766 - - - - - - - - - - -
248 15.7 7.0 22 358 done -0.25 1.02 - 2242 166.7 - - 2329 - - 100.30 0.001 2259 -5.1 8.214 - - - - - - - - -
364 21.4 - 35 475 roll 1.07 1.52 - 2544 198.7 2.62 - 3802 562.2 121.6 97.93 0.001 1763 -5.1 11.218 - - - - - - - - -
SM 0.34 - - - - -7.52 - - 633 - - - 2021 - 200.41 49.05 - 1451 -6.4 INF - - - - - -