DavisStrait May07 * SG001 * Dive index * Mission links * Dive 228 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.62 of 91.80 AH used of 24V (87.35% remains)
• Previous NAKs 0, Timeouts 0 • 6.84 of 61.20 AH used of 10V (88.82% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.6 m depth, ceiling -993.4 m
• GPS1 time: 14 s
• GPS2 time: 36 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 104 done -1.07 - - 636 - - - 2042 - -121.6 -43.58 - 2770 - - - - - - - - - - -
110 1.7 -2.0 7 130 roll -1.07 6.75 - 2076 213.3 2.53 - 595 -571.9 -121.6 - - 2761 - - - - - - - - - - -
192 15.2 12.4 15 302 done -0.25 1.00 - 2277 201.0 - - 2484 - - 99.75 0.001 2254 -5.1 7.996 - - - - - - - - -
308 21.0 - 28 419 roll 1.07 1.20 - 2549 226.7 2.40 - 3791 544.6 121.6 98.53 0.001 1769 -4.9 10.699 - - - - - - - - -
SM 0.34 - - - - -7.38 - - 657 - - - 2063 - 200.66 49.33 - 1448 -6.5 INF - - - - - -