DavisStrait May07 * SG001 * Dive index * Mission links * Dive 225 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.47 of 91.80 AH used of 24V (87.51% remains)
• Previous NAKs 0, Timeouts 0 • 6.79 of 61.20 AH used of 10V (88.90% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 4.4 m at 5.4 m depth, ceiling 1.0 m
• GPS1 time: 18 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 666 - - - 1970 - -121.6 -43.38 - 2760 - - - - - - - - - - -
101 0.5 -0.3 6 121 roll -1.07 6.75 - 2075 208.7 2.20 - 641 -604.1 -121.6 - - 2758 - - - - - - - - - - -
243 15.4 6.6 22 353 done -0.25 0.90 - 2289 237.8 - - 2576 - - 98.20 0.001 2271 -5.0 7.905 - - - - - - - - -
360 20.9 - 35 471 roll 1.07 1.10 - 2560 246.4 1.92 - 3802 638.5 121.6 98.68 0.001 1764 -5.1 11.114 - - - - - - - - -
SM 0.34 - - - - -7.40 - - 658 - - - 2046 - 200.16 48.92 - 1450 -6.4 INF - - - - - -