DavisStrait May07 * SG001 * Dive index * Mission links * Dive 223 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.37 of 91.80 AH used of 24V (87.62% remains)
• Previous NAKs 0, Timeouts 0 • 6.76 of 61.20 AH used of 10V (88.96% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 33 s
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 93 done -1.07 - - 625 - - - 2212 - -121.6 -43.20 - 2759 - - - - - - - - - - -
100 0.3 - 6 120 roll -1.07 7.53 - 2084 193.8 2.58 - 744 -569.0 -121.6 - - 2757 - - - - - - - - - - -
252 15.6 6.3 24 361 done -0.25 1.25 - 2292 166.4 - - 2495 - - 98.25 0.001 2272 -4.9 7.970 - - - - - - - - -
367 20.9 - 37 478 roll 1.07 1.23 - 2547 207.3 3.28 - 3798 397.3 121.6 99.30 0.001 1764 -5.1 11.066 - - - - - - - - -
SM 0.33 - - - - -7.54 - - 650 - - - 2104 - 200.66 49.88 - 1442 -6.5 INF - - - - - -