DavisStrait May07 * SG001 * Dive index * Mission links * Dive 221 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.26 of 91.80 AH used of 24V (87.73% remains)
• Previous NAKs 0, Timeouts 0 • 6.73 of 61.20 AH used of 10V (89.01% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.2 m at 5.9 m depth, ceiling 3.7 m
• GPS1 time: 18 s
• GPS2 time: 33 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 618 - - - 2192 - -121.6 -43.08 - 2758 - - - - - - - - - - -
102 0.3 - 6 125 roll -1.07 7.00 - 2100 211.7 2.58 - 708 -575.2 -121.6 - - 2746 - - - - - - - - - - -
257 15.4 5.8 24 366 done -0.25 0.80 - 2253 191.2 - - 2321 - - 96.53 0.001 2265 -5.0 7.942 - - - - - - - - -
373 20.4 - 37 483 roll 1.07 1.45 - 2567 216.6 3.03 - 3786 483.5 121.6 98.82 0.001 1764 -5.1 10.705 - - - - - - - - -
SM 0.34 - - - - -7.44 - - 640 - - - 2178 - 200.16 49.38 0.001 1445 -6.5 0.224 - - - - - -