DavisStrait May07 * SG001 * Dive index * Mission links * Dive 219 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 11.17 of 91.80 AH used of 24V (87.83% remains)
• Previous NAKs 0, Timeouts 0 • 6.69 of 61.20 AH used of 10V (89.06% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 4.9 m at 5.6 m depth, ceiling 0.7 m
• GPS1 time: 6 s
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 587 - - - 2024 - -121.6 -43.33 - 2760 - - - - - - - - - - -
101 0.4 -0.2 6 120 roll -1.07 7.05 - 2056 208.4 2.42 - 689 -551.7 -121.6 - - 2752 - - - - - - - - - - -
241 15.2 7.1 22 351 done -0.25 1.55 - 2207 97.4 - - 2557 - - 98.22 0.001 2274 -4.9 7.656 - - - - - - - - -
357 20.9 - 35 468 roll 1.07 1.50 - 2543 224.0 2.25 - 3786 546.2 121.6 99.15 0.001 1773 -5.1 10.931 - - - - - - - - -
SM 0.34 - - - - -7.51 - - 627 - - - 2070 - 200.16 48.67 0.001 1451 -6.6 0.230 - - - - - -