DavisStrait Sep09 * SG099 * Dive index * Mission links * Dive 21 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 2.00 of 150.00 AH used of 24V (98.67% remains)
• Previous NAKs 0, Timeouts 0 • 0.59 of 100.00 AH used of 10V (99.41% remains)
• Surface angle -1.4 deg, depth -0.00 m • Intended pitch -18.3 deg, speed -10.000 cm/s
VBD pumped to 350.29 (SM_CC=350)
• GPS1 time: 26 s • bottom range 0.0 m at 66.1 m, depth 66 m (100 m grid)
• GPS2 time: 12 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
15 end surface: CONTROL_FINISHED_OK
15 begin dive
18 - - - 88 done -1.33 - - 298 - - - 2136 - -146.0 -67.20 - 3358 - - - - - - - - - - -
92 1.2 -1.9 10 109 roll -1.33 10.45 - 2413 202.4 2.33 - 3500 585.4 -146.0 - - 3352 - - 4 - 1 - - - - - -
533 58.1 -11.9 45 549 done -1.33 0.32 - 2325 -275.0 3.38 - 1799 -503.3 -146.0 - - 3356 - - - - 4 - - - - - -
794 end dive: TARGET_DEPTH_EXCEEDED
794 begin apogee
800 91.0 12.8 67 930 done -0.31 1.38 - 2600 199.3 - - 2052 - - 122.85 0.001 2749 -4.9 45.765 - - - - - - - - -
933 end apogee: CONTROL_FINISHED_OK
933 begin climb
935 93.4 - 78 1065 roll 1.33 2.03 - 3016 204.9 2.92 - 249 -617.5 146.0 119.97 0.001 2157 -4.9 46.911 2 - 3 - - - - - -
1488 33.9 12.2 112 1501 done 1.33 0.62 - 2888 -206.5 3.30 - 2114 565.2 146.0 - - 2153 - - 1 - 3 - - - - - -
1761 3.0 8.7 140 1782 VBD 1.36 0.25 - 2963 300.0 - - 2107 - 174.8 17.60 - 2053 -5.7 - - - - - - - - - -
1782 end climb: SURFACE_DEPTH_REACHED
1783 begin surface coast
1849 end surface coast: CONTROL_FINISHED_OK
1849 begin surface
SM -0.01 - - - - -10.77 - - 311 - - - 1928 - 350.29 113.82 - 1326 -6.4 INF - - - - - -