DavisStrait May07 * SG001 * Dive index * Mission links * Dive 208 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 10.62 of 91.80 AH used of 24V (88.44% remains)
• Previous NAKs 2, Timeouts 0 • 6.51 of 61.20 AH used of 10V (89.35% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 0.7 m at 4.9 m depth, ceiling 4.2 m
• GPS1 time: 14 s
• GPS2 time: 20 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 645 - - - 2044 - -121.6 -43.25 - 2762 - - - - - - - - - - -
102 0.4 -0.1 6 126 roll -1.07 6.75 - 2080 212.6 2.42 - 575 -607.0 -121.6 - - 2754 - - - - - - - - - - -
248 15.1 6.6 22 358 done -0.25 1.10 - 2204 112.7 - - 2567 - - 98.62 0.001 2261 -5.0 7.813 - - - - - - - - -
365 20.7 - 35 476 roll 1.07 1.77 - 2551 196.0 2.30 - 3794 533.5 121.6 97.45 0.001 1771 -5.0 10.773 - - - - - - - - -
SM 0.34 - - - - -7.60 - - 609 - - - 2020 - 200.66 49.10 - 1446 -6.6 INF - - - - - -