DavisStrait May07 * SG001 * Dive index * Mission links * Dive 201 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 10.26 of 91.80 AH used of 24V (88.82% remains)
• Previous NAKs 0, Timeouts 0 • 6.40 of 61.20 AH used of 10V (89.54% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 0.9 m at 4.9 m depth, ceiling 4.0 m
• GPS1 time: 8 s
• GPS2 time: 14 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 641 - - - 2056 - -121.6 -43.53 - 2755 - - - - - - - - - - -
101 0.4 - 6 121 roll -1.07 8.00 - 2079 179.8 2.42 - 551 -621.9 -121.6 - - 2763 - - - - - - - - - - -
242 15.4 6.6 22 352 done -0.25 1.05 - 2182 98.1 - - 2572 - - 99.40 0.001 2261 -5.1 8.050 - - - - - - - - -
358 20.9 - 35 470 roll 1.07 1.65 - 2549 222.4 2.35 - 3722 489.4 121.6 98.75 0.001 1767 -5.0 10.821 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 614 - - - 1988 - 200.16 48.95 - 1441 -6.7 INF - - - - - -