DavisStrait May07 * SG001 * Dive index * Mission links * Dive 151 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 7.74 of 91.80 AH used of 24V (91.57% remains)
• Previous NAKs 2, Timeouts 0 • 5.61 of 61.20 AH used of 10V (90.84% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 6.5 m at 5.5 m depth, ceiling -1.0 m
• GPS1 time: 10 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 630 - - - 2057 - -121.6 -43.10 - 2759 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 7.78 - 2063 184.2 2.83 - 607 -512.4 -121.6 - - 2765 - - - - - - - - - - -
228 15.4 7.0 20 338 done -0.25 1.27 - 2277 168.5 - - 2483 - - 98.47 0.001 2261 -5.1 8.158 - - - - - - - - -
345 21.2 - 33 455 roll 1.07 1.83 - 2557 153.0 2.75 - 3780 471.6 121.6 98.43 0.001 1762 -5.1 11.124 - - - - - - - - -
SM 0.34 - - - - -7.45 - - 637 - - - 2075 - 200.16 49.00 - 1441 -6.6 INF - - - - - -