DavisStrait May07 * SG001 * Dive index * Mission links * Dive 123 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 6.32 of 91.80 AH used of 24V (93.11% remains)
• Previous NAKs 2, Timeouts 0 • 5.16 of 61.20 AH used of 10V (91.57% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 4.6 m depth, ceiling -994.4 m
• GPS1 time: 17 s
• GPS2 time: 16 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 629 - - - 2041 - -121.6 -43.20 - 2755 - - - - - - - - - - -
101 0.5 -0.3 6 120 roll -1.07 6.90 - 2052 206.2 2.12 - 588 -685.4 -121.6 - - 2760 - - - - - - - - - - -
228 15.1 7.4 20 338 done -0.25 1.00 - 2281 229.0 - - 2385 - - 98.35 0.001 2255 -5.1 8.025 - - - - - - - - -
345 21.2 - 33 455 roll 1.07 1.20 - 2547 221.7 2.53 - 3788 554.5 121.6 98.62 0.001 1771 -4.9 10.769 - - - - - - - - -
SM 0.34 - - - - -7.60 - - 611 - - - 2162 - 200.16 49.67 - 1438 -6.7 INF - - - - - -