PortSusan 23Jul07 * SG001 * Dive index * Mission links * Dive 115 * Raw log
prev dive * next dive * dive
• Previous call tries 5 • 86.24 of 91.80 AH used of 24V ( 6.05% remains)
• Previous NAKs 0, Timeouts 0 • 13.68 of 61.20 AH used of 10V (77.65% remains)
• Surface angle -50.0 deg, depth 0.00 m • Intended pitch -20.0 deg, speed -10.000 cm/s
VBD pumped to 450.37 (SM_CC=450.37079) • surface range 0.3 m at -0.0 m depth, ceiling -0.3 m
• GPS1 time: 10 s • bottom range 29.0 m at 75.5 m, depth 104 m (100 m grid)
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
32 end surface: CONTROL_FINISHED_OK
32 begin dive
38 - - - 113 done -1.21 - - 633 - - - 2186 - -121.6 -66.95 - 2757 - - - - - - - - - - -
119 2.3 -5.6 10 137 roll -1.21 7.05 - 2009 195.2 3.25 - 416 -544.6 -121.6 - - 2759 - - - - - - - - - - -
412 37.5 -11.7 57 420 done -1.12 - - 2011 - 3.15 - 2094 532.7 -121.6 - - 2755 - - - - - - - - - - -
782 81.2 -11.9 118 791 roll -1.10 0.03 - 2011 - 2.62 - 3616 580.9 -121.6 - - 2757 - - - - - - - - - - -
951 end dive: TARGET_DEPTH_EXCEEDED
951 begin apogee
968 100.8 10.5 146 1076 done -0.25 1.12 - 2264 225.9 - - 1854 - - 99.30 0.001 2254 -5.1 52.848 - - - - - - - - -
1077 end apogee: CONTROL_FINISHED_OK
1077 begin climb
1083 92.3 - 152 1097 VBD 1.21 1.45 - 2602 233.1 - - 1844 - 121.6 9.77 0.001 2199 -5.6 53.780 - - - - - - - - -
1098 end climb: SURFACE_DEPTH_REACHED
1098 begin surface coast
1102 end surface coast: CONTROL_FINISHED_OK
1102 begin surface
SM -0.00 - - - - -7.41 - - 646 - - - 2101 - 450.37 272.40 - 427 -6.5 NaN - - - - - -