DavisStrait May07 * SG001 * Dive index * Mission links * Dive 114 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 5.87 of 91.80 AH used of 24V (93.61% remains)
• Previous NAKs 2, Timeouts 0 • 5.01 of 61.20 AH used of 10V (91.81% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 1.5 m at 5.8 m depth, ceiling 4.3 m
• GPS1 time: 25 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 94 done -1.07 - - 621 - - - 2029 - -121.6 -43.55 - 2754 - - - - - - - - - - -
101 0.4 -0.1 6 121 roll -1.07 7.03 - 2069 206.0 2.60 - 587 -554.6 -121.6 - - 2766 - - - - - - - - - - -
229 15.1 6.9 20 339 done -0.25 0.90 - 2286 241.1 - - 2426 - - 98.53 0.001 2260 -5.1 8.026 - - - - - - - - -
345 20.8 - 33 455 roll 1.07 1.25 - 2548 209.6 2.53 - 3790 539.1 121.6 99.28 0.001 1767 -5.0 10.690 - - - - - - - - -
SM 0.34 - - - - -7.58 - - 622 - - - 2065 - 200.66 49.05 - 1440 -6.7 INF - - - - - -